Quality Control
1) Mold Forming
Confirm the figures and discuss mold opening with customers, confirm the time for mold trial and conduct mass production if the size is correct.
Lead Time: 25~40 days
2) Sample Die-Casting Production
Confirm the material type, injection, flash treatment and size inspection.
( Including Electrostatic Liquid Coating, Aluminium Plating, Lacquer Enamel, Temperature Treatment...etc)
Lead Time: 5~10 days
3) Surface Finishing
Process according to customers' needs.
Lead Time: 5~10 days
4) Packaging
Pack according to the designated capacity from our customers
5) Testing / Report Providing
Process according to customers' needs.
6) Shipping
Ship to designated locations from our customers and port declaration for international shipping.