1) Mold Forming Confirm the figures and discuss mold opening with customers, confirm the time for mold trial and conduct mass production if the size is correct. Lead Time: 25~40 days
2) Sample Die-Casting Production Confirm the material type, injection, flash treatment and size inspection. ( Including Electrostatic Liquid Coating, Aluminium Plating, Lacquer Enamel, Temperature Treatment...etc) Lead Time: 5~10 days
3) Surface Finishing Process according to customers' needs. Lead Time: 5~10 days
4) Packaging Pack according to the designated capacity from our customers
5) Testing / Report Providing Process according to customers' needs.
6) Shipping Ship to designated locations from our customers and port declaration for international shipping.
Song Te Metal Co., Ltd., found in 1991, is a professional and experienced manufacturer in Taiwan. The full-fledged array of the production proffered by us includes non-stick pans/woks, trash bins, bathroom accessories, kitchenwares and promotional giftwares. Our products have been expanded worldwide through direct or indirect sales channels....